| Inspection Category |
Inspection field |
Range of inspection |
Stage of Inspection |
Inspection criteria |
Inspection Activity Type |
Status |
| Regulatory Inspection |
| - Regulatory inspection – Engineering Supervision & safety in under construction projects.
| - Engineering Supervision and Safety Section Periodical inspection for under construction buildings Follow-up of construction accidents
| - Buildings Under Construction
| DMBACD- ST-PR07-7.2' Aris flow chart ANNEX 5-4 DM-BACDST- PR07-7.2-P1-01 DMBACD-ST-PR07-7.2' Aris flow chart ANNEX 5-4 DM-BACDST-PR07-7.2-P1-01 | A | Active
|
- Regulatory Structural inspection –Engineering Supervision to Control under construction projects.
| - Construction Control Section
| DMBACD-ST-PR07-7.2 Aris flow chart ANNEX 5-4 'Inspection procedures DMBACD-ST-PR07-7.2 Control Construction Section procedure 'DMBACD-ST-PR07-7.2-P2-01 | A | Active
|
- Inspection to issue buildings’ completion certificate.
| - Construction Control Section: Site inspection of services and completion
| DMBACD- ST-PR07-7.2 Aris flow chart ANNEX 5-4 Inspection procedures DMBACD-ST-PR07-7.2 Control Construction Section procedure DMBACD-ST-PR07-7.2-P2-01 | A | Active
|
- Regulatory inspection – Engineering Supervision of existing buildings.
| - Buildings Control Section 1. Inspection to issue a report describing lands or existing buildings 2. Inspection of existing buildings to issue violations and follow-up
| | Inspection procedures DMBACD-ST-PR07-7.2 Aris flow chart ANNEX 5-4 Building Control Section: procedure DM-BACDST-PR07-7.2-P2-01 | A | Active
|
- Regulatory Inspection for Temporary Winter Camp
| - Buildings Control Section: Permit for Temporary Winter Camp.
| | Inspection procedures DMBACD-ST-PR07-7.2 | A | Active
|
- Execution and monitoring of Buildings’ Demolition.
| - Engineering Evaluation and Demolition Section: Execution of Buildings Demolition
| | Inspection procedures 'DMBACD-ST-PR07-7.2 ' Aris flow chart ANNEX 5-4 | A | Active
|
- Regulatory inspection – Engineering Supervision in buildings Demolition works
| - Engineering Evaluation and Demolition Section: 1. Engineering supervision for Demolition works of buildings with demolition permit
| Inspection procedures DMBACD-ST-PR07-7.2 Aris flow chart ANNEX 5-4 | A | Active
|
- Engineering Inspection for building Evaluation
| - Engineering Evaluation and Demolition Section: Building technical study
| | Engineering evaluation and demo. Procedure BACDST-PR07-7.2- P1-01 | A | Active
|